Harvey
The front-page article in the Nov. 14 edition of The Paper, “Why didn’t Valdese pursue grant funding for its public safety building?” poses a question Valdese taxpayers deserve an answer to.
Harvey
FOR THE PAPERThe difference at issue is $19.4 million ($10.8 million Valdese debt vs. $8.6 million Granite Falls grant funding). Correct answers can be found in the minutes and video recordings of Valdese Town Council meetings.
For example, as reported in the Dec. 4, 2024, Valdese Town Council meeting minutes:
“Mayor Watts noted that he had been told some citizens thought we already had bid documents, which was untrue. Mr. Beal (the architect already paid over $200,000 to develop construction documents, for a contracted total project cost of $6.5 million) stated that construction documents had not been completed and the delay was due to the design team but not by intention … Councilwoman Lowman and Councilman Mears shared their disappointment in the timeline of the work that has been done and the lack of communication. Councilman Harvey asked if the $9.2 million construction estimate was for the building or total project cost. Mr. Beal stated it would be for hard costs, not soft costs, which do not include design, engineering, or geotechnical fees. With soft costs included, Mr. Beal feels the project’s total cost may reach $10 million.”
Thus, given earlier documented estimates of soft costs and site preparation approaching $3 million, this 24,000-square-foot, staff-specified building on Pineburr Avenue SE, on top of the $10 million hard cost estimate, was approaching $13 million.
Following closed-session discussion on Dec. 4, 2024, “Councilwoman Lowman made a motion to terminate the contract with the CBSA architect, seconded by Councilwoman Ward. The vote was unanimous.”
Although little comfort to Valdese taxpayers, the 2026 contract for the staff-specified 25,000-square-foot building on Massel Avenue SW for $11.5 million is less — not $3.5 million more — as the article reports.
Over the past two years, there were several failed attempts to avoid excessive debt. However, the only increases were the building’s size, Valdese’s tax rate (the highest among any Burke County municipality), and Valdese’s long-term debt (the highest among any comparable North Carolina town).
The question, “Why the $19.4 million difference in Granite Falls funding?” remains. Or does it?
As Hamlet’s mother responded to his question about the role that played her in a play within Shakespeare’s play, “The lady doth protest too much, methinks,” meaning the declarations (about a $3.5 million cost of delay) are too excessive and insistent to be credible.
Another unanswered question is how the Lovelady fire station in Rutherford College could be built at a fraction of the square-foot cost of Valdese’s building.
Glenn Harvey is a former member of the Valdese Town Council.
Success! An email has been sent to with a link to confirm list signup.
Error! There was an error processing your request.
Sorry, an error occurred.
Already Subscribed!
Cancel anytime
Thank you .
Your account has been registered, and you are now logged in.
Check your email for details.
Submitting this form below will send a message to your email with a link to change your password.
An email message containing instructions on how to reset your password has been sent to the email address listed on your account.
No promotional rates found.
Secure & Encrypted
Thank you.
Your gift purchase was successful! Your purchase was successful, and you are now logged in.
| Rate: | |
| Begins: | |
| Transaction ID: |
A receipt was sent to your email.
(0) comments
Welcome to the discussion.
Log In
Keep it Clean. Please avoid obscene, vulgar, lewd, racist or sexually-oriented language.
PLEASE TURN OFF YOUR CAPS LOCK.
Don't Threaten. Threats of harming another person will not be tolerated.
Be Truthful. Don't knowingly lie about anyone or anything.
Be Nice. No racism, sexism or any sort of -ism that is degrading to another person.
Be Proactive. Use the 'Report' link on each comment to let us know of abusive posts.
Share with Us. We'd love to hear eyewitness accounts, the history behind an article.